Port & Maritime Civil Engineering Design

No. Project Client Project Cost (RM) Project Description
1. Title:-
Development Of Slipway For Fishery Complex At Kuantan, Pahang, Malaysia.

Status:-
Construction Completed

Images:-
(View Photo)
Perunding Teras/ Fishery Development Authority of Malaysia RM 10mil 3 acres  slipway to cater for 9nos. vessels, max. 250GT per boats with winches and rail slips.
2. Title:-
Upgrading Infrastructure For Fishery Port in Chendering, Terengganu Malaysia.

Status:-
Detail Design Completed
Public Works Department, Malaysia RM 40mil Extension to main breakwater 350m and 200m secondary breakwater

Design for 2m-6.4m wave height with 6tons-15 tons Acropode and  2tons-7tons Acropode as armour units for main breakwater and secondary breakwater respectively.

Mooring jetty 325m length and 30m width for 10nos berth for Class A & B fishing vessels.

Open type berthing structures and fendering system designed for target vessels of 120GRT and possible controlled berthing of class ‘C/C2’ vessel.

Dredging works of the port basin at level –4.5m above LSD with approximately 200,000m2 dredged volume
3. Title:-
Redevelopment Of Kuala Perlis Fishery Port, Perlis, Malaysia

Status:-
Construction Completed

Images:-
(View Photo)
Perunding SSR/ Fishery Development Authority of Malaysia RM 30mil 2 hectares reclamation

25m x 200m quay berth structure for fishing vessels ,  office complexes, auction hall, commercial building, canteen, amenities building, store, fish box storage shed
4. Title:-
Navigational Aids at Variaus Locations (42 locations)

Status:-
Construction Completed
Marine Department Malaysia. RM 25mil Marine Piling Works at deep water

Reinforced concrete structure and pigmented FRP triangle daymark beacon for navigational aids
5. Title:-
Maintenance Dredging For Kuala Selangor River, Selangor, Malaysia

Status:-
Design Completed
Marine Department Malaysia RM 6mil Design of navigation channel to 4.5m ACD and dredging works requirement for the river mouth.
6. Title:-
Slipway@Mukim Semarak On Lot 1185, Kelantan, Malaysia

Status:-
Design Completed
Tok Bali Dockyard & Engineering Sdn Bhd RM 5mil 0.8acres  slipway to cater for 2 nos. vessels, max. 500GT per boat with winches and  rail slips.

Demolition of a portion of existing slipway

Design of reinforced concrete retaining wall.
7. Title:-
Proposed Fishing Port Development For Fishery Development Authority, Endau, Johor, Malaysia.

Status:-
Construction Completed

Images:-
(View Photo1)
(View Photo2)
(View Photo3)
Fishery Development Authority of Malaysia RM 22mil 222m quay wall berthing structure, office complexes, auction hall, commercial building, canteen, amenities building, store, fish box storage shed, Class F & C staff quarters and hostel for 50 personnels on 8.7 hectares development area,  1000 kVA sub station and 60,000 gal mushroom elevated water tank

Infrastructure works include road, drainage, sewerage and oxidation pond
8. Title:-
Proposed Fishing Landing Jetty and Other Related Works at:

i) Kertih, Kemaman, Terengganu Darul Iman

ii) Sungai Rengit, Pengerang, Johor Darul Takzim

iii) South Port, Kelang, Selangor Darul Ehsan

Status:-
Construction Completed
Fishery Development Authority of Malaysia RM 6mil Jetty berthing structures on the coastline and river bank, administrative office, infrastructure works and coastal protection works.
9. Title:-
Jetties and Landings For Tourism

i) Jeti Teluk Aur, Pulau Perhentian Kecil

ii) Jeti Pasir Panjang, Pulau Perhentian Kecil

iii) Jeti Pasi Mat Kedah, Pulau Perhentian Kecil

iv) Jeti Pasir Air, Pulau Lang Tengah

v) Jeti Teluk Kalong, Pulau Redang

Status:-
Design Completed
Ministry of Tourism, Malaysia RM 10mil 11 nos jetties  for tourist boats.

Design to consider environmental sensitivity with regard to corals and beach front

 

 

10. Title:-
Redevelopment of Swettenham Pier, Penang

Status:-
Construction Stage

Images:-
(View Photo1)
(View Photo2)
(View Photo3)
(View Photo4)
Penang Port Commission, Ministry of Transport RM 65mil Demolition of existing jetty

Construction Of New Main T-Pier

Jetty, Trestle, dolphin & walkway bridge to cater berthing of 4 nos. of Cruise vessels max. size 113000GRT and 2 pontoons for 4 berth of 250T coastal ferries .

Custom, immigration, Quarantine  Terminal building with passenger boarding bridge.

Infrastructure work
11. Title:-
Expansion of North Butterworth Container Terminal (Contruction of Container Yard)

Status:-
Construction Stage

Images:-
(View Photo1)
(View Photo2)
(View Photo3)

 i)  Layout Plan (View Photo)

 ii) Reclamation (View Photo)

 iii) Package 4
(View Photo)
(View Photo)
Penang Port Sdn  Bhd, Malaysia RM 200mil Container Yard for 5406 TGS and 120 reefer points with road works and hard standing to cater for electrified RTG on 21 hectares vertical drained reclaimed ground, drainage works, water supply and hydrant pipe reticulation including tapping point, pump house, water tank, High Mast’s, feeder pillar, substations and bus stop shelter.
12. Title:-
Proposed Development for Marine Police Base at Lahad Datu, Sabah

Status:-
Construction Completed

Images:-
(View Photo1)
(View Photo2)
(View Photo3)
(View Photo4)

Phase 1
(View Photo)

Phase 2
(View Photo)
Ministry Of Internal Affairs, Malaysia RM 80mil The development is planned for Polis Marin in Lahad Datu, Sabah that comprises to two phases that phase one is 15 acres reclamation and earthwork and phase two is building works. Revetment for 1.5m wave height.

T-shape jetty for 4 berth catering PCB, PA and 2 Nos PX Boats, boat ramp, slope protection works and floating pontoon system (aluminium frame & timber deck) for 12 PSC.

The building works are construction of Administration Block, Surau, Multi Purpose Hall, Workshop, Tadika and PERKEP, Residential Building comprises Detached House Class D, Semi detached Class D and E, Flat Class F and Flat Class G and Guard House, Bin Center, Grandstand, Jetty and Ramp. Playing field with sub-soil drain.

Road and hardstanding, water reticulation (66, 500 gallon per day), sewerage reticulation with 950 PE sewerage treatment plant and MASMA Drainage System including Gross Pollutant Trap (GPT)
13. Title:-
Proposed Development for Marine Police Base at Tanjung Kupang, Johor

Status:-
Construction Stage

Images:-
Package 1 – Reclamation, Basin Excavation, Maritime Works, Main Road Infra (View Photo)

Package 2 – Trimming of excess earth, Building and infrastructure works 
(View Photo)

Package 3 - Trimming of excess earth, Building and infrastructure works
(View Photo)
Pembinaan BLT Sdn Bhd. RM 375mil

RM 125mil
The development is constitute a training complex, staff quarters and maritime berthing structures and infrastructure works that approximately 110 acres of mangrove swamp reclamation works including site clearing, reclamation works with bore piles retaining structure.

The C&S works includes major works i.e. 1.5mil m3 of land reclamation works, construction of jetties, slipway, boat lift platform, procurement of pontoons, staff quarters; high-rise (18-storey), medium-rise, low-rise building, administration building, swimming pool complex, multipurpose hall, boat hanger & storage, workshops, water tank tower.

The development will be subdivided into four zones which only approximately 84 acres is proposed to be developed with built up area and infrastructure, while the other 26 acres which is the existing mangrove forest will remain undisturbed for sustainable development.

Road, water supply, MASMA drainage with STD and 5000 PE sewerage system.
14. Title:-
Cadangan Pembinaan Pejabat Daerah Maritim Kuala Terengganu Di Mukim Losong, Daerah Kuala Terengganu, Terengganu

Status:-
Construction Stage

Images:-
to be updated
Agensi Penguatkuasaan Maritim Malaysia (APMM) RM 32mil Precast T-shape jetty for Maritime Enforcement Agency crafts of 90m in length x 10m in width and approach bridge 30m in length x 8m in width including 48m in length x 5m in width of cast in situ reinforced concrete boat ramp, slope protection works, floating pontoon system (aluminium frame & timber deck) and drive on/drive off docking system for 3.5 tonne crafts (2 berthings).